Sydney’s new M8 WestConnex Motorway from Kingsgrove to St Peter’s

Sydney’s new M8 WestConnex Motorway is the second major underground stage of the WestConnex Motorway Network. Previously known as the New M5 during planning and construction, the M8 comprises twin 9km-long tunnels running from Kingsgrove to the new St Peter’s Interchange.

An instrumental role in both commissioning and completions phases of the M8 WestConnex

ACOM Group successfully commissioned and proved the functionality of over 20,000 assets during project completion. ACOM mobilised a multi-discipline blue-collar workforce of over 250 employees and a staff team of 30. We also implemented a permit-to-work system to ensure construction continued in a controlled environment.

High Voltage Testing | ACOM Group
big_line_tik
Website aboriginal design element

Project Details

Client: CPB Dragados Samsung JV
Project Type: Infrastructure Road
Scope: Completions and commissioning
Location: St Peters, NSW
Project Value: $4.335 billion
ACOM Group | Control Room
ACOM Group’s Key Functions
High-voltage relay testing
High-voltage switchboard and transformer testing
Low-voltage export power switchboards
General light and power
UPS and battery systems
Cross passage PLC cabinets
Roadside PLC cabinets
Variable messaging signs
Integrated speed and lane use sign
Videowall
CCTV Cameras
PA System
Mobile Phone
Jet fans
Axial fans
Pump rooms
Hydrant and deluge system

Interested to learn more about ACOM Group?