FMG Pilbara Transmission

GIS High Voltage WA Pilbara Transmission Project
Iron Ore Mining Construction Pilbara Transmission Project
Website aboriginal design element

FMG Pilbara Transmission Project

Integrating Fortescue Metals Group (FMG)’s iron ore mining and port operations in the Pilbara into one common 220kV network, the Pilbara Transmission Project comprises 275km of high voltage overhead transmission lines with terminal and substation infrastructure.

Powerlines Plus contracted ACOM Group to undertake the installation and pre-commissioning of 220kV GIS (Gas Insulated Switchgear).

ACOM Group applies in-depth expertise to install specialised switchgear

Working closely with Powerlines Plus, ACOM Group’s experienced personnel are efficiently executing our scope of work to ensure we meet project deadlines. Complimented on our high level of onsite professionalism, we have fully embraced the responsibility and accountability required to ensure the successful completion of the project.

GIS HV Specialised Switchgear | ACOM Group
big_line_tik
Website aboriginal design element

Project Details

Client: FMG – Powerlines Plus
Project Type: High voltage power transmission network installation
Scope: Installation and pre-commissioning
Location: Pilbara, Western Australia
Project Value: $250 million
HV Gas Insulated Switch Gear Pilbara Transmission Project
ACOM Group’s Key Functions
Construct and install 220/33/11kV Gas Insulated Switchgear
Vendor inspection and quality assurance
High Voltage Commissioning of Gas Insulated Switchgear

Interested to learn more about ACOM Group?

As your project delivery partner, ACOM Group provides solution-focused services to the infrastructure, energy, resources, mining and utility sectors.